Frame
Tracks are fixed to the set-out line at floor and head. C-studs stand at 600 mm centres and get checked for plumb.
70 mm metal stud · 600 centresDrylining contractors · All London boroughs
Stud partitions, wall linings and MF ceilings across London. Straight, flush boards, ready for finishing. Clear labour prices; materials quoted separately.
2400 × 1200 sheets
studs at 600 centres
screws at 300 centres
How a Frameon wall goes up
Tracks are fixed to the set-out line at floor and head. C-studs stand at 600 mm centres and get checked for plumb.
70 mm metal stud · 600 centresBoards go on one face first. Every joint lands on a stud, with screws at 300 mm centres.
12.5 mm acoustic board · Type DMineral wool fills the cavity, cut tight between the studs so there are no gaps for sound to pass.
50 mm mineral woolThe second face closes the wall. Screw heads sit just below the surface without breaking the paper, ready for taping or plaster.
15 mm fire board · Type FWhat we frame and board
New rooms and layouts on metal or timber stud, with acoustic and fire-rated build-ups.
from £30 / m²A new flat, boarded face over existing brick or block.
from £19 / m²Suspended metal-furring ceilings built to an agreed level, around your services.
from £28 / m²Pipes and services concealed, with access left where you need it.
from £32 / mRecesses and ceiling details formed to your dimensions.
from £120Labour only. Materials are quoted separately and paid for by the client.
Our own site photos
Drag the handle. On the left, the metal frame with cross bracing. On the right, the wall boarded in pink fire-rated plasterboard.
Frame
Boarded








Instant guide price
£350 labour minimum. Your fixed quote follows once scope and site are reviewed.
15% off for new clients
From photo to finished wall
WhatsApp us photos, rough sizes and your postcode. Drawings help, but you don't need them.
Frame, boards, layers, openings and who supplies what. Agreed in writing before work starts.
On the agreed dates. You get straight, flush boards, ready for taping or plaster.
Before you build
Yes. As well as framing and boarding, we take on turnkey finishing: taping and jointing, plastering and decorating. Finishing is priced separately after we measure up on site.
The client. Our prices cover labour only. We work out the materials for your job separately, and you pay for them.
Both. We build internal, non-loadbearing framing in metal or timber stud. MF ceilings use metal furring.
No. It gives a guide range from our price list, with a £350 labour minimum. Your fixed quote follows once scope and site are reviewed.
Your postcode, what you want to build, rough measurements and a few photos. Drawings or a specification help if you have them.
Free quote from your photos